强夯施工过程中道路路基的填充中怎么应用

网址:www.qianghangzulin.cn  2026-09-05  作者:admin    阅读:

一、确定技术参数
1、 Determine technical parameters


强夯施工时需要在路基填土的选择上选择无杂草的用品,除此之外应该采取分层的方式来进行对道路的填充,并且把表面的泥土清楚干净和使用弱风化砂岩进行回填才能保证好的效果,地基强夯施工还需要在夯击遍数直到贯入度和隆起的高度都符合要求才能进行道路的施工。
During the construction of dynamic compaction, it is necessary to choose weed free materials for the roadbed filling. In addition, a layered approach should be adopted to fill the road, and the surface soil should be cleaned and weakly weathered sandstone should be used for backfilling to ensure good results. The foundation dynamic compaction construction also needs to be carried out after the number of compaction passes until the penetration and uplift height meet the requirements before the road construction can be carried out.


二、施工机械准备
2、 Preparation of construction machinery


强夯施工中机械设备的选用对道路填充的效果有影响,并且机械的准备会关系到施工作业效率和质量,所以在施工的时候需要对这个环节加以重视,航锤和起重机等等的设备都是完成道路工程的重要因素,并且脱钩装置可以使航锤平稳下落保证施工的进度正常进行。
The selection of mechanical equipment in dynamic compaction construction has an impact on the effectiveness of road filling, and the preparation of machinery will affect the efficiency and quality of construction operations. Therefore, this link needs to be taken seriously during construction. Equipment such as hammers and cranes are important factors in completing road engineering, and decoupling devices can ensure the smooth fall of hammers to ensure the normal progress of construction.


三、工人技术准备
3、 Worker technical preparation


工人的技术是道路填充整个工程的重要部分之一,强夯施工过程中跟工人的技术是密切相关的。技术人员可以对工程地质的报告进行全面的研究并且在参与施工工作的时候进行技术较低让其明确质量的标准和安全的措施,在入岗前要进行相应的培训明白强夯施工的方法从而保证施工的正常进行。
The skills of workers are an important part of the entire road filling project, and the construction process of dynamic compaction is closely related to the skills of workers. Technicians can conduct comprehensive research on engineering geological reports and provide technical guidance to clarify quality standards and safety measures when participating in construction work. Before entering the job, they should receive corresponding training to understand the methods of dynamic compaction construction and ensure the normal progress of construction.